HONGYANG GROUP Ecuador Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Ecuador Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

P-G2 FUEL DISPENSER

P-G2

P-G2 FUEL DISPENSER

Pump Type:Optional

Inlet Pressure:>=54kPa

Flow rate (L/min.):55±5

Suction Distance (m):6(verticalmente) / 50(orizzontalmente)

FlowMeter:Type:Optional

Accuracy:±0.2%

Motor Voltage(V):110V/220V/380V,50Hz/60Hz

Capacity(hp):1HP(0.75kw)

Input Voltage:110V/220V/380V,50Hz/60Hz

Nozzle:Auto Shut-off Nozzle

Environmental Condition:-40~~+55degree

Control Type:Solenold Vale Control Type

Preset:Function Provided(Small LCDIndicator)

Display(Counter):Type:LCD and Bright Backlight

Digit of Volume:0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount:0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price:0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range:0~~99,999,999,99

Optional Display:Type:LCD and Bright Backlight

Digit of Volume:0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount:0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price:0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range:0~~99,999,999,99

Totalizer:1~~9,999,999

Hose:4.5m

Weight:215kg

Dimension(L×W×H):1060*550*1620(mm)

Dimension(L×W×H)Of Qty of Container:40ft: 44 20ft: 22

products links

links

technical archives

    ’t shut. Check valve can’t open fully as amount of waste at the lower fuel dispenser part of outlet valve of vapor separator. Upper cover gasket of vapor separator is broken, leads to pressure not enough. 3.5. Pipeline is jammed and bottom valve could not fully open. Serious fluctuation and noise in operation Jammed filter net and too long or too thin pipeline cause heavy loan making big noise. Locked overflow valve or too tight adjusting bolt. Jammed vane causes serious oil fluctuation Pipeline vibrates heavy. Delivery frequency is same to inherent mechanical frequency. instable flow rate as starting Overflow valve works abnormally. Pipeline has U shape curve, generating air resistance. Pipe valve has some trouble. Contain foam in flowing oil Pipe and bottom valve trouble because of ceaseless exhausting air in vapor separator. Exhausting pipe inhales air. Inspect check valve and cone-shaped valve. Vapor separator’s outlet valve and exhausting valve is jammed leading to fail to separate air from oil. Accuracy beyond scope Double optical board is broken in pulse sensor, which leads to countable pulse lost. Inner leakage in measurement transducer causes accuracy beyond range. Change new transducer. As insufficient capacity of vapor separator, check outlet valve and exhausting pipe. Fuel dispenser’s main board is broken, which also lead to inaccuracy. Pipeline leakage causes vapor separator lost function. Motor rotates slowly and become hot as refueling Motor has been destroyed. Winding short circuit or disconnected; starting capacitor has been damaged in single phase motor; Control circuit of motor is broken, which leads to sta fuel dispenser rting problem. Exterior wiring also cause motor failure, (absent electric phase, long wiring distance, too thin lead, much lower voltage) Oil overflowing in exhausting pipe Small floater is damaged and dropped down in vapor separator. Large amount of oil flow into vapor separating chamber; oil is discharge from exhausting pipe as return valve trouble fuel dispenser

technical specification

    The PCD is likely to be solely responsible for the   ge fuel dispenser neration of the W M checksum so where the W M   functionality is required the PCD will have to implement it   as described above. The acceptability of a PCD between   the Site ControllerCD in this environment will have to be   checked with the body responsible for giving the W M   approval.  October 2005 IFSF - STANDARD FORECOURT PROTOCOL FP31_2.22   DISPENSER APPLICATION   Page: 81   81 Bin16 W(1-9) M   W M_Seed   (51H) (0-65535)   To allow the CD to configure the seed used by the   dispenser to calculate the W M security checksum.   Please note that in implementations where the W M_Seed   may not be changed. The Write should be rejected with a   Data_ACK of 2 (Not writable).   Please note that this Data_Id is a write only field. Any   attempt to read it must result in the answer message being   returned with the Data_Id s Data_Lg set to zero (i.e.   80 00).   PCD Comment:   The PCD is likely to be solely responsible for the   generation of the W M checksum so where the W M fuel dispenser   functionality is required the PCD will have to implement it   as described above. The acceptability of a PCD between   the Site ControllerCD in this environment will have to be   checked with the body responsible for giving the W M   fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    phed the secret diplomacy that culminated in a formal peace agreement. fuel dispenser Three years later, as Israel s ambassador to the European Union, Mr Halevy was called upon to make a third fateful intervention in Jordan. Mossad had tried to assassinate Khaled Mashal, a Hamas leader, in Amman by squirting a slow-acting poison in his ear. The attempt was bungled, two agents had been captured by the Jordanians and another four were holed up in the Israeli embassy. With his precious peace treaty at risk, Mr Halevy was summoned home to save the situation. This he did by engineering a swap in return for forgiveness (and the six Israeli agents), Israel released the jailed founder-leader of Hamas, Sheikh Ahmed Yassin (only to assassinate him in turn, at the height of the Palestinian intifada in 2004). After this, Mr Halevy was called back to become the agency s head in 1998. Two years later, Mossad was shaping Israel s relations with the Arabs once again. This time it was the Palestinians. In 2000, Bill Clinton s attempts to broker a peace deal at Camp David failed. The incoming administration of George Bush had no strong interest in this conflict (and even fewer ideas) about what to do. But the Mossad chief began to pick up an unusual message from his friends in Washington. They wanted Israel under Ariel Sharon to come up with a policy that Israel and America could pursue jointly, provided the Israeli ideas did not serve Israel s interests alone, but also America s. In 2002 a spate of Palestinian suicide-bombings prompted Israel to reconquer the West Bank. But the Israelis had no clear notion of what to do next. So Mossad stepped into the vacuum an fuel dispenser d produced one “regime change?for the Palestinian Authority. The spies drafted a plan under which Yasser Arafat would be marginalised and a Palestinian prime minister would take over his executive power. This was intended to produce a credible Palestinian partner for Israel, who might go on to rule a Palestinian state in provisional borders. Mr Halev fuel dispenser